|
CONSIDER THESE
POINTS
 |
Improves effluent quality |
 |
One chamber – one
hole – one connection |
 |
Prevents clogged drainage
systems |
 |
Protects the envionment |
 |
The simplest and least
expensive system to operate |
 |
Fewer working parts, low
maintenance |
 |
Easy to maintain |
 |
Approved by local councils |
 |
Durable pre-cast concrete,
no plastic or fiberglass to crack or rot. |
APPLICATIONS
 |
For residential homes |
 |
For holiday homes |
 |
For commercial applications |
 |
For grease trap applications |
|
|
 |
Primary Pre-treatment chamber (usable) |
3,560 litres |
 |
Secondary Pre-treatment chamber (usable) |
1,180 litres |
 |
Pump well |
700 litres |
 |
Total operating capacity |
5,440 litres |
 |
Total holding capacity |
7,500 litres |
 |
Control panel (optional) including
audio/visual alarm & hi level float |
 |
Overall length |
3 metres |
 |
Overall width |
1.8 metres |
 |
Overall height |
1.55 metres |
 |
Weight |
4.5 tonnes |
 |
Invert level (less extension turrets) |
300mm |
Manufactured in ultra strong durable 35mpa concrete
Manufactured to Aus/NZs 1546.1:1998
|
|